Wastewater Technical Approval in Indonesia: From Pertek to SLO

When a factory expands or changes its discharge point, environmental, engineering and permitting teams need to agree on the data and design that will go into the application. This guide takes them from screening to field verification.

Field documentation from the wastewater technical approval study at Arutmin Batulicin
Wastewater technical approval study, PT Arutmin Indonesia’s Batulicin Site.

Four steps from screening to SLO

  1. Map the activity and screen the proposal

    Identify wastewater sources, capacity or process changes, the proposed method of discharge or reuse, and outlet locations. Review existing environmental approvals and documents. For activities requiring technical approval (Pertek), self-screening determines the technical supporting documents.

  2. Prepare a technical study or document compliance with technical standards

    Follow the screening outcome. A technical study calls for analysis suited to the proposed activity. For surface-water discharge, this can cover the receiving water baseline, wastewater characteristics, treatment design and predicted impacts. Where government-set technical standards apply, document how the facility will meet them. Where the relevant standards are unavailable, prepare a technical study as provided for in the regulation.

  3. Submit the Pertek application

    Check that design flows, treatment capacity, compliance monitoring points and the monitoring plan agree across maps, drawings and the technical submission. Address requests for revision and incorporate the final changes throughout the submission.

  4. Build, commission and prepare for SLO verification

    Once Pertek is issued, align installation and operations with its technical requirements. Prepare implementation records, as-built drawings and relevant commissioning records for the assessment of the Operational Feasibility Certificate (SLO). Check field conditions before verification by the competent authority.

What to bring to the first technical meeting

  • Process flow diagrams and a water balance, including streams affected by higher production.
  • Wastewater flow and quality data, with sampling locations, dates and conditions.
  • Treatment plant drawings, installed capacity, operating records and proposed capacity.
  • A map showing discharge or reuse points, receiving conditions and existing documentation.

Ganeca case study

Arutmin Batulicin wastewater discharge study

Ganeca assessed a proposal to discharge water from a settling pond into surface water. The study looked at upstream and downstream conditions and accounted for seasonal differences in the receiving environment.

Read the case study →

Plan the next step for your Pertek application

To discuss the scope of your Pertek application, gather the information you already have.

  • Flow diagram and wastewater flow data
  • Proposed process or capacity changes
  • Available environmental documents and plant drawings