Ganeca prepared a technical study for a proposed discharge to surface water. The work assessed receiving water conditions at upstream and downstream locations.
Ganeca supports manufacturers and industrial facilities with initial screening, wastewater technical approval (Pertek) documentation, and preparation for operational feasibility verification (SLO).
We tailor the scope to your project stage, treatment plant condition, and proposed wastewater discharge or reuse.
We review the activity, wastewater flow and characteristics, the proposed discharge or reuse, and existing environmental documents. The initial output is a list of missing data and a proposed documentation route.
Based on screening, Ganeca prepares a technical study or documentation showing how applicable technical standards will be met. The scope can include the water balance, treatment design basis, receiving water conditions, and management and monitoring plans. We also help respond to review comments.
After construction and trial operation, we help check the installation against the technical approval, summarise monitoring results, and prepare evidence and documents for verification. The competent authority issues the technical approval and SLO.
Ganeca prepared a technical study for a proposed discharge to surface water. The work assessed receiving water conditions at upstream and downstream locations.
Gather process information, treatment plant details, and receiving water data where relevant. Our guide addresses common questions before applying.
Pertek sets technical requirements for planned wastewater discharge or reuse. SLO concerns whether the system built and tested meets those requirements.
Changes in production can affect flow, wastewater characteristics, or plant design. Review the changes against the existing technical approval, environmental documents, and applicable requirements to determine whether updates are needed.
The first discussion can start with the information you already have. Ganeca helps identify any additional site surveys, test results, or design data needed for the project.
Start with the information you already have.