Before mobilisation
Map clearing limits, drainage routes, runoff outlets, and sensitive areas around the site. Use the map to set sediment control priorities.
Ganeca supports construction projects through environmental planning, permitting, monitoring, laboratory testing, pollution control, and regulatory reporting—helping project teams manage site impacts, maintain compliance, and deliver responsibly.
We develop practical environmental strategies aligned with project phases and regulatory requirements.
Read More
Ganeca and Akalab deliver reliable site data for compliance and project control.
Read More
We control runoff, erosion, sediment, dust, and waste across active construction sites.
Read More
We design, operate, and optimize treatment systems for reliable site water management.
Read MoreClearing, excavation, and drainage changes shift runoff paths during construction. Control plans and monitoring points need to follow the work as site conditions change.

Map clearing limits, drainage routes, runoff outlets, and sensitive areas around the site. Use the map to set sediment control priorities.
Inspect drains, stockpiles, and settling facilities after rain. Record flow changes and maintenance needs. Consider dust and noise monitoring at locations that represent site activity.
Review monitoring points and controls when work areas move or drainage changes. Keep site records for corrective actions and project reporting.
Energy Infrastructure
Work on the proposed development in the Maro River catchment included water quality testing, a bathymetric survey, and interviews with local residents.

Runoff Control During Construction
Ganeca characterised runoff and sediment, tested treatment options, and evaluated settling pond design during construction at the mine project.
Talk with our construction environmental experts to identify compliance priorities, monitoring needs, and practical controls for your project.
Check out what's new in our company !