Talk to Us
Skip to Content
Service Areas

Environmental Consulting in Sidoarjo–Pasuruan

Ganeca helps food, beverage, and manufacturing plants in Sidoarjo and Pasuruan with environmental documentation, treatment plant evaluations, and wastewater monitoring.

Illustration of a beverage bottling line and factory utilities

Factory Wastewater and Treatment Capacity

Production and cleaning schedules can change wastewater flows and characteristics. Ganeca uses records for each stream to assess treatment capacity and monitoring points.

Sidoarjo

For processing facilities in areas such as Berbek, map flows from production, cleaning, and utilities. If wastewater goes to estate treatment, compare its quality and flow with the operator’s acceptance criteria.

Pasuruan

For plant expansions in areas such as PIER Rembang, estimate how a new line will affect water demand, peak cleaning flows, and treatment capacity.

Transport of a Ganeca modular wastewater treatment unit

Explore industrial wastewater treatment services

Services for Factories and Industrial Estates

Water studies and estate handover points

Separate process flows, sanitary wastewater, and stormwater. Water balance and handover studies help align the plant’s needs with estate treatment capacity.

Environmental studies for industrial estates

Environmental monitoring and SPARING

Choose sampling points and times that represent production and cleaning conditions. Assess online monitoring and data requirements where applicable.

Environmental monitoring SPARING monitoring
Field team visiting a monitoring location beside a water body

Preparing for a Consultation

What records help with a treatment plant review?

Gather process diagrams, production and cleaning schedules, flow data, influent and effluent test results, and operating and maintenance records.

What should a plant review before adding a line?

Compare expected water demand and wastewater flows after the new line starts with available treatment capacity. Also review cleaning schedules and monitoring points.

Discuss Your Factory Plans

Share the site, production activities, and expansion plans or current challenges. Ganeca can help define the initial scope.

Discuss Your Project on WhatsApp