Talk to Us
Skip to Content
Service Areas

Environmental Consulting in Dumai, Riau

Ganeca supports palm oil processors, oleochemical plants, and industrial terminals in Dumai and Riau with environmental studies, wastewater treatment, and monitoring.

Illustration of a coastal vegetable oil processing facility and tank terminal

Industrial Wastewater and Terminal Runoff

Palm oil processing and oleochemicals

For facilities in areas such as Lubuk Gaung and Pelintung, map streams from production, cleaning, and utilities. Use variations in flow, pH, and oil and grease loading to assess pretreatment needs and treatment capacity.

Bulk terminals and coastal industrial sites

Review drainage around storage tanks, loading areas, and pipelines. Separate potentially contaminated runoff, determine controls, and locate monitoring points before water reaches coastal waters.

Ganeca team inspecting a water treatment control panel

Environmental Services for Industry in Dumai

Environmental monitoring and SPARING

Choose locations, parameters, and schedules that represent site conditions. Assess online monitoring and data records where applicable.

Preparing for Your Consultation

What information should we prepare?

Share a site and drainage plan, production processes and capacity, cleaning schedules, and available wastewater flow and quality data.

What if we are adding a tank or production line?

Include the new equipment location, estimated water use, and drainage changes so the team can assess additional treatment loads and monitoring needs.

Ganeca field team reviewing a monitoring point beside a water body

Discuss Your Dumai Project

Tell us what the facility does, where it is located, and which expansion plans or operating issues you need to address.

Discuss Your Project on WhatsApp