Talk to Us
Skip to Content

SPARING Wastewater Monitoring: What Should Your Company Prepare?

SPARING connects field measurements of wastewater quality with continuous online reporting. Before requesting proposals, agree on monitoring locations, operating conditions and ownership of incident response. Use this checklist for the site survey and supplier evaluation.

Documentation from the PT Vale Indonesia wastewater monitoring project
SPARING monitoring project, PT Vale Indonesia.

A checklist before buying or installing equipment

Applicability and parameters
Check whether requirements apply based on the type, scale and conditions of the activity under the applicable rules. Reconcile required parameters with environmental documentation and site conditions. Ask the supplier about sensor ranges, calibration and verification methods.
Monitoring points and access
Check whether the location represents the effluent being discharged. During the survey, examine flow variation, sediment buildup, flood risk and access for inspection, comparison sampling and maintenance. Include monitoring point drawings and the sample collection or conveyance method in the scope.
Power and connectivity
Measure signal quality at the installation location. Check the station’s power needs and an appropriate backup supply. Define how data is stored and retransmitted after connectivity returns, and agree on a transmission test before handover.
Data validation, maintenance and response
Assign responsibility for anomaly review, sensor maintenance, calibration records and missing data. Use field checks to distinguish deviations in the wastewater from potential sensor faults. Prepare manual monitoring and records as required under the applicable rules.

Test the system before handover

Ask the supplier to demonstrate the full path from measurement at the site to timestamping, transmission and display on the receiving platform. Simulate a connection outage under controlled conditions and check how data is handled after recovery. Agree on who receives alerts, how quickly they respond and how they record resolution.

Ganeca case study

Integrating 24 SPARING points for PT Vale Indonesia

Ganeca integrated measurements from Pomalaa and Bahodopi into GanecaLink and supported maintenance and calibration. The project shows how an environmental team can monitor multiple points from a single platform.

Read the case study →