Water Accounting for Mining Operations
Learn how to build a site water balance, select measurement points and map operating records to GRI 303 disclosures. This guide includes a flow diagram and a monthly example you can work through.
Start with the site boundary and the operating decision
A rising pond level at a mine can result from storm runoff, groundwater pumping or water transferred from elsewhere. Those inputs may look the same on a level recorder. They can call for different actions. The site team may need to create more storage, adjust a pump or divert water to a process that still needs supply. Water accounting helps the team explain where water came from, where it went and how much remains in storage.
Mark the operational boundary on a map and set a reporting period, such as the beginning to the end of a calendar month. Mark sources, storages, treatment units, reuse pipelines and outlets. Use the catchment boundary to understand where runoff originates. The catchment boundary can differ from the site boundary used for accounting. Set both before teams start collecting data.
- InflowsRiver intake, pumped groundwater and rainfall or runoff captured by the site.
- Storage and usePonds, treatment units, dust suppression and process water demand.
- Outflows and storage changesDischarge, evaporation and the change in the volume retained on site.
Internal return flow · Water from a pond or treatment unit can return to a process. Record this volume as internal reuse.
Separate flows crossing the site boundary from transfers within it. Moving water from a storage pond to a treatment pond does not count as another withdrawal in the site balance. That volume still helps explain pumping demand and treatment capacity. See the Water Accounting Framework for mining.
Measure the flows that affect site decisions
Start with points that carry large volumes, respond quickly to rainfall, or determine water intake and discharge. Choose accessible locations and collect data over the same reporting period. A totaliser provides monthly volumes in a main pipeline. In an open channel, convert recorded water levels to discharge using a relationship verified for the local channel.
| Flow or storage | Data and measurement | Month-end checks |
|---|---|---|
| Intakes and pump lines | Totaliser readings or integrated flow records. | Units, pump hours, meter resets and periods with missing readings. |
| Runoff entering ponds | Rainfall, the catchment area draining into the pond, and estimated runoff or channel measurements. | Drainage changes, missing rainfall and runoff-model or coefficient assumptions. |
| Outlet to receiving water | A flow meter or water levels paired with a verified rating curve. | Channel geometry changes, sediment, high-flow bypasses and missing observations. |
| Pond storage and reuse flows | Water levels and the elevation–volume curve for storage. Measure the main reuse lines separately. | Matching start and end times, changes in storage capacity and possible double counting. |
For each point, record the location ID, unit, timestamp, data source, method and accountable team. Distinguish measurements from estimates. When readings are missing, keep the reason, substitution method and review record so the estimate can be traced.
A worked monthly water balance
This example uses illustrative figures for a single mine site. River intake and pumped groundwater volumes were recorded, captured runoff was estimated, and pond volume change was derived from opening and closing readings. All figures use m³ and the same reporting boundary.
For illustration, 60 mm of rain over a contributing area of 10 hectares gives 1,500 m³ of estimated runoff with a coefficient of 0.25. The calculation is 0.06 m × 100,000 m² × 0.25. On a real site, identify the area that actually drains to the pond and check the estimate against flow observations or changes in storage.
| Component | Volume (m³) | Treatment in the physical balance |
|---|---|---|
| River intake | 1,200 | Inflow from outside the site boundary. |
| Pumped groundwater | 2,300 | Inflow recorded from the pumps. |
| Captured rainfall runoff | 1,500 | Inflow based on an estimate for the relevant drainage area. |
| Discharge to receiving water | 3,500 | Outflow through the outlet. |
| Evaporation from storage | 1,000 | Water lost to the atmosphere from the pond surface. |
| Change in pond storage | +500 | Closing volume is 500 m³ higher than opening volume. |
| Internal reuse | 2,800 | Tracked separately as an internal flow. |
Map site records to GRI 303 disclosures
The physical balance makes site figures traceable. For reporting, map flows to GRI 303 definitions, identify areas with water stress, and report in megalitres (ML). One ML equals 1,000 m³. Under GRI, collected or harvested rainwater is included in surface water. Check flow paths and the reporting boundary before classifying captured runoff. Read GRI 303: Water and Effluents 2018.
| Disclosure | Site records | Worked example |
|---|---|---|
| 303-3 · Water withdrawal | Volumes by source, water-quality category and areas with water stress, as required. | 5.0 ML, comprising 2.7 ML of surface water including the runoff captured in this example, and 2.3 ML of groundwater. |
| 303-4 · Water discharge | Volumes by destination and relevant quality information. | 3.5 ML discharged to surface water. |
| 303-5 · Water consumption | Measured consumption or an estimate with a stated method. | If consumption cannot be measured directly, GRI allows 5.0 − 3.5 = 1.5 ML. Disclose the +0.5 ML storage change where significant under Disclosure 303-5. |
To consolidate records across sites, align dates and units and reconcile transfers in each site’s records. Treat them at consolidation according to the reported organisational boundary. Retain site-level records so teams can trace estimates, report volumes for water-stressed areas and explain significant changes in storage. See GRI disclosures 303-3, 303-4 and 303-5.
Ganeca case study
River flow monitoring for PT Kaltim Prima Coal
Ganeca supported PT Kaltim Prima Coal through a river flow monitoring station (SPAS) that provides continuous discharge data. The project illustrates how a mine can establish field flow records to understand changing conditions and inform operating decisions.
Read the case study →Technical references
Related services
Mine Water Management
For site teams mapping flows, assessing storage and treatment, or defining measurement needs.
Explore mine water management →Sustainability & ESG
For companies establishing a baseline and linking water data from several operations to sustainability reporting.
Explore Sustainability & ESG services →Review your site water balance
To discuss your water balance, gather the information you already have.
- Site and catchment maps and known flow paths
- Measurement points and their data sources
- One period of flow, use and storage data